Phase 2 of the Waterfront Design Plan is underway and we need your input into the Design Concepts.
Complete the online survey at www.saultstemarie.ca/waterfront
You are also invited to attend a public open house on May 1 from 4:30 - 7 p.m. in the lobby of the Civic Centre.
Feedback on the Design Concepts will be accepted until May 24.